1、TECHNICAL GUIDELINES FOR INTEGRATED APPLICATION OFELECTRIC VEHICLES AND RENEWABLE ENERGY088Incentive model:according to the formulated incentive measures of the long cycle(such as day ahead,one day in advance)and short cycle(such as real-time,hour level),a charging and discharging incentive model is
2、 formed in V2G management system,which includes V1G price and discharging incentive,and has rolling correction function.Grid modelThe station areas of operators points of interconnection are modeled.This part is similar to the grid model established in the V1G management system.Please refer to 3.3.1
3、.2.3(4).2)Input and output of V2G management system Input parameterCharging application information:receive vehicle charging application information(order information)from the user,including vehicle model(the system automatically matches the corresponding EV model,including capacity,charging power c
4、urve,control parameters and other information),SOC,charging mode(V1G,V1G and discharging,normal charging),and charging end time(end time/vehicle use time).Load curve information:formulate the charging load optimization target curve at a fixed period(such as 30 minutes/60 minutes,the period can be ad
5、justed and set),or receive the charging load optimization target curve and other load prediction curves(including residential load,office load,etc.)issued by the superior platform,to provide basic data support for the formulation of charging and discharging strategies.Incentive information:a bidirec
6、tional interactive incentive plan for a certain period of time is issued through fixed period,manual trigger or automatic trigger.Station area status information:Operators acquire the operation information of the power distribution network periodically(every 30 seconds),and update the status informa
7、tion of the power distribution network model.Output strategyOutput to the operator service network operation monitoring systemvehicle charging and discharging plan:vehicle charging and discharging plan arrangement or adjustment information,including total charging,charging power,total discharging,to
8、tal charging price estimation,discharge incentive income,etc.Charging exception information:if the vehicle fails to park and insert the gun at the planned starting time of charging,or the gun is pulled out during charging and discharging(not ending as planned),the corresponding exception information
9、 will be sent to V2G management system.Adjustment of vehicle charging and discharging plan:due to vehicle order adjustment,charging 125Technical Guidelines(Continued)Standard categoryApplication fieldStandardStandard numberConsortium standardsEnergy storage technologyTechnical specifications for coo
10、rdinated operation of household PV-ESS thermal storage systemT/CES 118-2022Technical specifications for energy management system of electrochemical ESS power stationsIn draftTechnical rules for electrochemical mobile emergency energy storage power systemIn draftTechnical guidelines for remote fire m
11、onitoring and early warning for electrochemical ESS power stationsIn draftTechnical specifications for local wireless networking of integrated energy systemT/CES 094-2022Technical specifications for connecting distributed ESS to the power distribution station areaIn draftGuidelines for energy effici
12、ency appraisal of electrochemical ESS power stationsIn draftProcedures for safe operation of the system of hydrogen production from water electrolysisIn draftTechnical requirements for dispatching control system of electrochemical ESS power stationsIn draftRegulations on technical supervision of ene
13、rgy storage equipment in electrochemical ESS power stationsIn draftTechnical requirements for actual measurement of parameters of the control model of electrochemical ESS power stationsIn draftTechnical specifications for commissioning of electrochemical ESS power stationsIn draftTechnical specifications for tests of automatic generation control and automatic voltage control system in electrochemical ESS power stationsIn draftSpecifications for on-site handover test of energy storage equipment in electricity distribution station areasIn draft