《DCIS – 數字孿生技術應用于信號處理.pdf》由會員分享,可在線閱讀,更多相關《DCIS – 數字孿生技術應用于信號處理.pdf(11頁珍藏版)》請在三個皮匠報告上搜索。
1、DCISThe Digital Controller Interface StandardDIGITAL TWINS OF SIGNALS FOR A CONNECTED FUTURE Overview/RecapDCIS(Andy Graham,Peter Routledge,Jon Wade and Mark Pleydell)is implementing three standards defining1.The number and type of signal-controlled sites in the UK2.The topology of each site and loc
2、ation of signals.3.The control strategies and parameters applied at each site.And processes for their creation and distributionWhy?To make signal control data available in uniform and open format.Enables a range of benefits eg simplifying and speeding up UTC configuration and microsimulation modelli
3、ng,throughConnected vehicle serviceslaying a base for autonomy of vehicles on the UKs road network,Digitising roads needs digital signalsWhat does this do and where is it?The DeliverablesoThe Intersection Summary Document(ISD)oThe site topology:A MAPEM file to the C-Roads standardoThe“e2500”,echoing
4、 the TOPAS 2500 signal controller definition,and site configuration.The ISDA list of all signal-controlled sites falling within boundaries of a local highway authority(whether or not they actually own the site).Uploaded to a central depository that does checking Each site(and each stream)has its own
5、 unique Simmonite number.DCIS has trialled the ISD process with Bath&NE Somerset,Dorset,Hull,Kirklees,Leeds,Staffordshire and TfGM our thanksSome tweaks to our guidance to come WE STRESS YOU DONT NEED TO RENUMBER YOUR SITESBeta test data Staffordshire CC locationsBeta test data Dorset CC ListMAPEM S
6、ite TopologyFollowing the C-Roads MAPEM standard for topologyconflict zones,Lanes(and pavements)Permitted vehicle types(including pedestrian modes)Times of accessSignal pole locations for control of movementsinterested in automated generation of MAPEM files.Is there a better way?E2500 The Controller
7、 ConfigurationHow a controller manages each site is determined by its configuration.This organises the different traffic movements,the timings,methods of control etc.to get the best from the siteCurrently this content is manufacturer specific.The E2500 file provides an open standardised form.Maximum
8、 granularityDiscoverabilityCurrently first draft is with Signal Companies and devolved GovernmentsWe continue to add facilities and will be seeking forgivenessFuture ActivitiesSupporting LHAs as they implement ISDs as a TSOG,GLF output.Extending the E2500 and progressing MAPEMIntegrating the data with other DfT systems for controlled and secure storage and access(eg D-TRO?)Following Government IT processes eg D-TROTesting use cases