《3. China Wind Power 2024 - Invest in Denmark.pdf》由會員分享,可在線閱讀,更多相關《3. China Wind Power 2024 - Invest in Denmark.pdf(13頁珍藏版)》請在三個皮匠報告上搜索。
1、June 2022Investment opportunities in Danish wind market丹麥風電產業情況及投資機會介紹Peder Bo SrensenInvest in DenmarkChina Wind Power 2024,BeijingWhyDenmark?Denmark is a global centre for wind power business development and technology development 丹麥是全球風能市場和技術開發的中心Long-standing government commitment to developing
2、Denmarks position as a renewable energy leader 丹麥政府長期致力于發展并保持丹麥在可再生能源領域的優勢Expanding market opportunities in Denmark and the rest of Northern Europe 利用丹麥作為進入北歐市場的入口A full wind power value chain with an exemplary collaborative business environment and public-private partnerships 完整的風電產業鏈,優異的產業合作氛圍及公私合
3、作機制State-of-the-art smart grid infrastructure 智能電網設施World-class research and talent pools focused on innovative and user-centered wind power solutions 世界級的風電研發及創新人才庫Excellent opportunities for cross-over innovation with other technologies 跨領域合作的機遇Best wind exploitation in the world2DENMARK:C02 emiss
4、ions to be Cut by 70%by 2030丹麥:2030年二氧化碳減排70%Law adopted by 172 of 179 members of the Danish parliament.議會通過,具有法律約束The law:Denmark must deliver a 70 percent reduction in greenhouse gases by 2030.氣候法案:至2030年,減少70%的溫室氣體排放Climate action plan:June 2020.Annual follow-up by the Danish Climate Council to m
5、onitor progress.丹麥氣候委員會年度追蹤氣候目標進展Denmark refrains from using purchase of CO2 allowances as a way to achieve the goal.不使用購買碳排放額度達成氣候目標MINISTRY OF FOREIGN AFFAIRS OF DENMARK3Establishment of the worlds first energy islands 建設能源島Transition to market driven build out of onshore wind and solarInvestments
6、 in next generation technologies:Power to X and Carbon Capture PTX 和碳捕捉Support for biogas and other green gases Energy efficiency measures 提升生物質氣體及其它綠色氣體的能效Green reform of heat taxes 供暖稅的綠色改革Increased utilization of surplus heat(e.g surplus heat from datacenters will no longer be taxed)余熱利用Green dis
7、trict heating 綠色區域供暖Green transport fund(including buildout of charging infrastructure for EVs)綠色交通基金(包含EV充電設施建設)Green tax reform(a CO2 tax will be introduced)綠色稅務改革First portion of climate action plan announced June 20202020年6月公布氣候行動計劃 Very significant in achieving a carbon neutral society Several
8、energy islands and a large scale power grid Sector coupling and regional integration Green electricity and e-fuels from renewable energy Energy independence and lower electricity pricesLong-term visionOFFSHORE WIND POWER MARKET development Denmark 2021 2040 Tender Projects丹麥海上風電開發分布圖,2021-2040年招標項目5
9、Source:4CoffshoreEsbjerg Declaration:offshore wind capacity increases to 65GW by 2030,150GW by 2050 in North Sea 埃斯比約宣言:北海區域海上風電發電量2030增至65GW,2050年增至150GWMarienborg Declaration:7 fold increase of offshore wind in Baltic sea to 19.6GW by 2030瑪瑞恩堡宣言:至2030年,波羅的海區域的海上風電發電量增長7倍至19.6GWOffshore Wind Tender
10、s 2024-Possibilityfor overplanting6/New tendersExisting/ExistingHessel Havvindmllepark Capacity:0,8-1,2 GW,depending on the concession winners final project.The tender is published in the spring of 2024.Application deadline is expected to fall in February 2025.Expected to be commissioned:end of 2030
11、Hessel Havvindmllepark|Energistyrelsen(ens.dk)Kriegers Flak II HavvindmlleparkCapacity:min.1 GW Tender is published in the spring of 2024.Application deadline is expected to fall in February 2025.Expected to be commissioned:end of 2030Kriegers Flak II Havvindmllepark|Energistyrelsen(ens.dk)Kattegat
12、Havvindmllepark Capacity:min.1 GWTender is published in the spring of 2024.Application deadline is expected to fall in February 2025.Expected to be commissioned:end of 2030 Kattegat Havvindmllepark|Energistyrelsen(ens.dk)Nordsen I(A1,A2,A3)Havvindmllepark Capacity:min.3GW(3x1GW)Tender is published i
13、n the spring of 2024.Application deadline is expected to fall in December 2024.Expected to be commissioned:end of 2030 Nordsen I(A1,A2,A3)Havvindmllepark|Energistyrelsen(ens.dk)Energi Bornholm Havvindmllepark(TENDER DELAYED)Capacity:3 GWContract notice:Spring 2024Expected to be commissioned:2030Ener
14、gy Island Bornholm|The Danish Energy Agency(ens.dk)72024-2030 Annual Wind power installations 2024-2030 Annual Wind power installations in EUEvolution of Cumulative Wind power Capacity in Europe8Expected new installations in Europe I 2024-20309Expected new installations in Europe II 2024-2030The Dan
15、ish Offshore Wind Power Industry Knowledge,Experience and dedication supported by excellent R&D centresRaw MaterialsIntermedia-te goodsComponent MfgWind Turbine Design and AssemblyPlanning&Design(EPC)InstallationAsset ownershipO&MVestasBlades SubseaCablesTowersControl&BrakesystemsOffshore Substation
16、sOffshore foundations.Including excellent supportive universities,test centres and engineering companiesGLOBAL OUTREACH AND LOCAL ECOSYSTEM11VestasWind Power developersGLOBAL turbine oems have presence in denmark TEST Facilities-examplessterild-National Testcenter for large wind turbinesDenmarks Nat
17、ional prototype test sites for offshore turbines up to 230 metres height.9 test stands.Hvsre Teststation for large wind turbinesNational Test site for turbines up to 165 metres tip height.7 test stands.http:/green.thisted.dk/wp-content/uploads/2013/02/SWP_P1010642-2.jpgDTU Wind Tunnel Denmarks Natio
18、nal Wind tunnel.Up to 105 m/s in windspeed.Combined measurement of aerodynamics and noiseLindoe Offshore Renewables Center-LORCLORC tests and demonstrates technology for harvesting renewable energy offshore.The Lindoe Nacelle Testing offers Functional tests and Highly Accelerated Lifetime Testing(HALT).BLAEST Blade test centerIndependent test center providening all kinds of Blade testPolytech Lightning Protection systemsTest facilities and test laboratories for lightning protectionThank you謝謝